Madison High School Sports Complex

MONTHLY PROJECT UPDATES

September 2018


PREVIOUS MONTH
ALL BOND PROJECTS
NEXT MONTH

WORK ACTIVITIES: The slabs for the North and South Box have been poured.  Site utilities have been prepped for tie-in during spud-harvest break.  Asphalt was poured at the southwest parking lot.  The CMP storm retention system has been installed at the west stadium parking lot.  Curb and sidewalk are being installed at the west side of the west stadium parking lot.  Curb is being installed at the outer edge of the track. The mainline for the irrigation line was extended
UPCOMING ACTIVITIES: Tie-in of the water and sewer will occur the first week of October during spud-harvest break.  Curb and drain will be installed at the track. Irrigation will be run for the in-field of the track in preparation for the installation of the sod.  Curb and gutter will continue to be prepped and installed at the west stadium parking lot.  Underground electrical will continue through the football field.  Posts for the 4’ chain link fence around the football field will be set in preparation for the ribbon curb.
Pit run placed at track.
North box slab poured at grandstands.
Irrigation main line extension.
Grading.

PROJECT SCHEDULE:

25%
Percent Complete

This project is being built for Madison School District #321
msd321.com
This project is being built by Headwaters Construction Company
HeadwatersCC.com